I hope this isn't a stupid question, but because of the way the NTLite UI shows the different sections in the left margin, I guess I assumed that was the way things were processed, i.e Integrate > Remove > Configure > Automate. Until an hour ago I don't think I'd ever given it any thought.
I normally create an ISO one section at a time, then stop, and reload the image (I think I read about that here). I do this in the order the sections are presented on the left, and I've typically been getting some minor error/warning message boxes pop up during the Configure Features step of the processing that always say "Operation requires missing files," as you can see in the attached image.
I just created a quick ISO to troubleshoot a driver issue, and I did it in one fell swoop and not one section at a time. I was just kind of daydreaming and staring at the screen while the processing was going on, and noticed that the processing order actually showed Configure > Remove > Integrate > Automate. In other words, Configure and Integrate switched places.
So now I'm wondering if it's user error on my part to create ISO's as I have been? Since I'm only doing one section at a time I'm forcing NTLite to Integrate before Remove, and Remove before Configure, where apparently it wants to do it in the opposite order. Please explain. Thanks.
View attachment 9327 View attachment 9326
I normally create an ISO one section at a time, then stop, and reload the image (I think I read about that here). I do this in the order the sections are presented on the left, and I've typically been getting some minor error/warning message boxes pop up during the Configure Features step of the processing that always say "Operation requires missing files," as you can see in the attached image.
I just created a quick ISO to troubleshoot a driver issue, and I did it in one fell swoop and not one section at a time. I was just kind of daydreaming and staring at the screen while the processing was going on, and noticed that the processing order actually showed Configure > Remove > Integrate > Automate. In other words, Configure and Integrate switched places.
So now I'm wondering if it's user error on my part to create ISO's as I have been? Since I'm only doing one section at a time I'm forcing NTLite to Integrate before Remove, and Remove before Configure, where apparently it wants to do it in the opposite order. Please explain. Thanks.
View attachment 9327 View attachment 9326